项目经验(案例一)

项目时间:2012-02 - 2012-04

项目名称:汽车项目供应商管理体系导入

项目描述:
项目介绍
作为SQE,确认供应商生产能力和质量控制系统是否满足TS16949要求,并对供应商所提交的PPAP进行确认管理,同时维护IMDS系统和编写原材料检验规范
我的职责
SQE主管

项目经验(案例二)

项目时间:2016-05 - 2016-07

项目名称:过程审核

项目描述:
项目介绍
该次过程审核圆满完成,所有问题项均在规定时间内进行整改关闭。
我的职责
担任过程审核的内审员,负责该次过程审核的整体审核计划的制定,首次会议的召开、过程审核的组织及实施、末次会议的召开以及问题项的跟踪等事宜。

项目经验(案例三)

项目时间:2014-09 - 2014-12

项目名称:APA & MRC Aus

项目描述:
项目介绍
1.Arrange work schedule as per customer's requirements;
2.Review mill's certificates and quality system management documents;
3.Review equipment valid certificates and calibration certificates of gauges;
4.Review qualifications of personnel;
5.Witness material's test, and Lab test
6.Witnessed repair area for external coating and internal coating
7. Coating of Pipe for 1067X12.27mm external FPE coating and internal painting.
External FBE coating,
8.Arrange work schedule as per customer's requirements;
9.Review mill's certificates and quality system management documents;
10.Review equipment valid certificates and calibration certificates of gauges;
11.Review qualifications of personnel;
12.Witness material's test, and Lab test.
13.Witnessed repair area for external coating and internal coating.
14.Witness truck loading, supervision, control and report of production process;
15.Review MTC and sign;
16.Issue the release note;
17.Write the daily report and Weekly report.
18.Inspection during the coating process and reviewed part records, test reports of coating production, including raw material confirmed, incoming rack inspection, the abrasive blasting, Dust test , Surface cleanliness, Surface profile ,control record of coating Environmental conditions, interval time of blasting and coating , Intermediate frequency heating and powder spray, water cooling, Coating appearance, on line and manual holiday detection test, External FBE thickness of coating, cutback pipe end record of coating, Packing etc.,
19.Witnessed lab test including after 24hours Catholic Disbandment test and hot water soak, Flexibility test, Interface contamination test, Interfacial Porosity test, Cross-section Porosity test.
我的职责

项目经验(案例四)

项目时间:2015-11 -  2016-01

项目名称:220V放电机7寸电屏降低成本30%

项目描述:
项目介绍
开发新供应商,保证质量和交期前提下价格实现30%以上的降低
我的职责
主导项目的开展和实施,开发新供应商,保证质量和交期前提下价格实现30%以上的降低,并将其他屏实现整合,跟供应商实现战略合作。